Contents of the Purge Labor History Tables Screen
Use the fields and options to configure the Purge Labor History Tables screen.
Selection Ranges
Use this group box to select the range of projects to include in the purge process.
Field | Description |
---|---|
Option |
From the drop-down list, select a project range. Valid options are:
If you select All, the Start and End fields are disabled; if you select One, the End field is disabled; if you select From Beginning the Start field is disabled; and if you select To End the End field is disabled. |
Start |
If your range selection is One, Range, or To End, enter, or use the to select, the project ID with which you want to start |
End |
If your range selection is Range or From Beginning, enter, or use to select, the project ID with which you want to end. |
Apply to Lower Levels |
Select this check box to purge all labor history records for the selected project and its lower levels. This check box is enabled if the Option drop-down list is set to One. |