Modifications Tab
Use this tab to enter all modifications for signed and funded value, as well as period of performance.
Enter the initial signed and funded value for a project against Modification "0000." Modification numbers other than "0000" are not treated as original value for reporting purposes.
Use this tab to enter the initial signed value, funded value, and period of performance for a project. Then use it only to update modifications to signed or funded value, or to the period of performance.
Contents
Field | Description |
---|---|
Modification ID |
Enter the project modification number. As long as numerals are used in the beginning or end of the modification number, Costpoint provides a default of the last modification number for the project plus one. If no modification numbers are found, it defaults to "0000." After you save the record, this field is non-editable. Note: The size of the initial modification number that is used also determines the size of all modification numbers for the project (that is, if you assign a modification number of
A1 as the first number, you run out of modification numbers after
A9 because Costpoint treats
A10 the same as
A1).
|
Description |
Enter the description of the modification. |
Period of Performance
Field | Description |
---|---|
Start Date |
Enter, or click to select, the start date of the project. The start date of the project is generally in the contract. |
End Date |
Enter, or click to select, the end date of the project. |
Value Modifications
Field | Description |
---|---|
Value |
This field displays either a user-supplied signed value for the project or a system-calculated signed value, which is derived by using the Cost, Fee, and Fee % fields. The calculation varies depending on which two of the three variables were entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Fee % |
This field displays either a user-supplied fee % for the project or a system-calculated fee %, which is derived by using the Value Modifications Cost, or Value Modifications Fee fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Cost |
This field displays either a user-supplied signed value for cost for the project, or a system-calculated cost value, which is derived by using the Fee, Fee %, and Value fields. The calculation varies depending on which two of the three variables was entered. At least two variables must be entered for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Fee |
This field displays either a user-supplied signed value for fee for the project, or a system-calculated fee value, which is derived by using the Current Cost, Current Fee, and Value fields. The calculation varies depending on which two of the three variables was entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Funding Modifications
Field | Description |
---|---|
Value |
This field displays either a user-supplied funded value for the project, or a system-calculated funded value, which is derived by using the Funding Value Current Cost, Funding Value Fee %, and Funding Value Current Fee fields. The calculation varies depending on which two of the three variables was entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Fee % |
This field displays either a user-supplied funded fee for the project, or a system-calculated funded fee, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables was entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Cost |
This field displays either a user-supplied funded value for cost for the project, or a system-calculated cost value, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables was entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |
Fee |
This field displays either a user-supplied funded value for fee (or profit) for the project, or a system-calculated fee value, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables was entered. You must enter at least two variables for any calculation to take place. If you enter a value (other than "0.00") here, it is not recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field is recalculated based on entries made to the other three variables. |